SlideShow

  • WaterOne Finance Team Watches Sale of Municipal Bonds Financing the Hedge Land Project
  • Supply Main Construction Aerial View
  • Step 3 - Hand Trowel the Concrete
  • Step 2 - Mechanically Level the Concrete
  • Step 1 - Manually Level the Concrete
  • Roof Slab Pours - 97 Percent Complete
  • Reservoir Wall Construction
  • Reservoir Columns
  • Reservoir and South Booster Pump Piping
  • Pumping Station Emergency Interconnect
  • Pumping Station - South Wall Interior
  • Pumping Station - South and East Exterior Walls
  • Project Open House for Olathe Residents and the Public
  • Prepping Reservoir Foundation, Removing Loose Rock and Silt
  • Preparing Forms for Roof Slabs
  • Pouring Concrete at Midnight
  • Pouring Concrete at 2 am to Beat the Summer Heat
  • Pouring Concrete at 2 am for the Pump Station Foundation to Beat the Summer Heat
  • Pouring Concrete - 125 Cubic Yards Per Section
  • Pipeline
  • Pipeline Installation October 2014
  • Perimeter Walls Going up
  • Over 78 Miles of Rebar Reinforcement Laid
  • Operating Floor Slab Near Completion
  • November 2015 Side View of Facility
  • November 2015 Interior View
  • November 2015 Concrete
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • November 2015
  • March 2014 Aerial Map at Pump Station/Reservoir
  • July 2014 Aerial Map at Pump Station-Reservoir
  • Interior Baffle Walls Under Construction
  • Installing Foundation of the Reservoir
  • Installing Foundation of the Reservoir
  • Installing Foundation of the Reservoir
  • Installing Foundation of the Reservoir
  • Installing 48 Inch Pipe
  • Greeting the Sunrise at Hedge Lane
  • Filter and Ventilation Room Masonry Wall Construction
  • Filter and Ventilation Room Masonry Wall Construction
  • Erecting Concrete Wall Forms
  • Emergency Interconnect Pipeline at Pump Station
  • Early Morning Concrete Delivery
  • Construction Perimeter and Pipe Trench Walls
  • Construction of Reservoir Perimeter
  • Construction of Base and Perimeter of the Pump Station and Reservoir
  • Constructing Reservoir Wall Reinforcement
  • Concrete Placement and Finishing
  • Concrete Placement and Finishing
  • Concrete Curing in Cold Weather
  • Cleaning Concrete Wall Form Tie Holes
  • Between the Layers of the Reservoir Wall Reinforcement
  • August 2014 Aerial Map at Pump Station / Reservoir
  • Applying Membrane Curing Compound to Concrete
  • 48 Inch Pipe Trenched at Test Site
  • 48 Inch Pipe Stocked at Test Site
  • 48 Inch Pipe Delivered to Test Site

Show previous set of thumbnails

Show next set of thumbnails

◄ Back to Hedge Lane Project photos