Temporary Meter for Construction Form

Print
Press Enter to show all options, press Tab go to next option
Please correct the field(s) marked in red below:

1

Requestors Information:

 *
Requestors Information:
2

Property Information:

 *
Property Information:
3

Property Owners Information:

 *
Property Owners Information:
4

Purpose of Meter:

 *
5

Proposed Meter Size:

 *
6

Maximum Flow Demand required:

 *
7

Applicant/General Contractor Information:

 *
Applicant/General Contractor Information:
8

Contractor Installing Service Line from Tap and Setting the Meter and Metter Pit:

 *
Contractor Installing Service Line from Tap and Setting the Meter and Metter Pit:
  • Submit drawings showing the proposed location for the tap, meter pit and backflow assembly.
  • Include calculations in gallons per minute (G.P.M.) on the largest zone, the number of zones that will be operating at the same time and the total number of zones in the system for each meter service.

Service Connection Notes:

  1. All taps to the water main are to be 5ft minimum from  any pipe joint in the water main or other taps on the water main.
  2. All service lines must be installed at a 90 degree angle from the water main to the meter pit and valve.
  3. Maintain a 3ft separation around meter pit from backflow assemblies, irrigation control boxes, or other objects.
  4. The meter pit shall be placed in the pubic right away or within the easement of the water main.
  5. Pre-approval must be obtained from WaterOne if there is possible conflict in meeting these requirements.

NOTE: Temporary Service Connections for Construction projects shall not be in service longer than eighteen (18) months unless otherwise approved by WaterOne.