Charges + Fees

Print

New Water Service Connection Charge

The new service connection charge covers the cost of materials, labor and overheads for the tap at the water main, and the materials for the meter and meter pit. Cost varies based on the connection type and meter size.

Effective April 1, 2015

All fees subject to change without notice.

Meter Size

Residential Standard

Commercial Standard1

From Fireline2

5/8” Meter, 1” Service

$ 705

$ 810

 $680

3/4” Meter, 1” Service

$ 755

$ 860

 $730

Two 5/8” Meters, 1” Service

$ 925

$ 1,030

-- 

1” Meter, 1” Service

$ 850

$ 955

 $825

1” Meter, 1-1/2” Service

$ 2,170

$ 2,275

 $2,035

1-1/2” Meter, 1-1/2” Service

$ 2,220

$ 2,325

 $2,085

1-1/2” Meter, 2” Service

$ 2,430

$ 2,535

 $2,230

2” Meter, 2” Service

$ 2,515

$ 2,620

 $2,315

4” x 3” Compound Meter

      N/A

$ 3,125 3

 --

Meter size and type are determined by WaterOne. Larger meters will be calculated at the time of Application.

1. Commercial Standard includes $105 CCC Plan Review.
2. Combination fire and domestic line as approved by WaterOne. includes $105 Plan Review Fee. Doesn't include connection to WaterOne's distribution system. 
3. Approximate based on 8” DI water main. Vault constructed by owner.


 

System Development Charge (SDC)

Growth pays for growth. The SDC compensates WaterOne for investments required in water supply, treatment, transmission and distribution facilities. The SDC is paid in addition to the New Service Connection Charge.

Any meter enlargement or meter type upgrade will be subject to an SDC equal to the difference in the current SDCs for the respective meter sizes and types. On multiple metered service connections, the SDC is based on the size and type of each individual meter. Meter sizes or types not listed below will be charged based on the standard meter capacity in gallons per minute (gpm) compared to the 5/8-inch displacement standard meter capacity.

WaterOne determines the most appropriate meter size and type based on the applicant's water usage characteristics and needs.

System Development Charges

Meter Size

Capacity (gpm)*

SDC

5/8” Displacement

20

$4,855

3/4” Displacement

30

$7,295

1” Displacement

50

$12,150

1-1/2” Displacement

100

$24,270

1-1/2” Turbine

120

$29,130

2” Displacement

160

$38,835

 2" Compound

160  $38,835 

2” Turbine

190

$46,125

3" Compound

350

$84,965

3" Turbine

435

$105,600

4" Compound

600

$145,650

4" Turbine

750

$182,065

*Allowable flow rates from some meter manufacturers may be higher than the standard flows listed above. The SDC will be charged based on the standard flows listed in the chart.

 


 

Fire Line Connection Charges

Fire line connection charges are determined at the time the permit application is made. An estimated fee is shown in the table below. Actual costs at the time of permit application may vary.

Fire Line Size

Estimated Fire Line Fee

4”

$1,585

6”

$1,770

8”

$2,205

12”

$3,560

 


 

 

Cancellation or Refund Policy:

The New Water Service Connection Charge and the System Development Charge are valid from 120 days of the issuance of the permit. If the tap has not been made within 120 days, WaterOne reserves the right to cancel, refund, or increase the cost of the permit.


Questions? Contact …

 

Residential Service                                                          Commercial Service
                                                                                        Chris Anderson   
Phone: 913/895-1815                                                         Phone: 913/895-5754
Fax:     913/895-5607                                                         Fax:      913/895-5607
Email:  distserv@waterone.org                                           Email:  distserv@waterone.org